挤塑板的施工条件
1、基层墙体已验收合格。门窗框及墙身上各种进户管线、水落管支架、预埋件等按设计安装完毕。
2、剪力墙平整度用2m靠尺检查,最大偏差大于4时,应用20厚1:3水泥砂浆找平;比较大偏差小于4时,不平处用1:3水泥砂浆修补平整。
3、砌体墙用20厚1:3水泥砂浆找平。
4、基层墙体及找平层应干燥。
5、施工现场环境温度和墙体表面温度在施工后24小时内不得低于5℃,风力不大于5级。
6、夏季施工时应该采取有效措施,防止雨水冲刷墙面。
Construction Conditions for Squeezing Plastics Plate
1, grassroots wall has been accepted and qualified. Door and window frames and walls on various incoming pipelines, fall pipe supports, pre-buried pieces, etc., according to the design and installation.
2, shear wall flatness is checked with a 2m ruler, the maximum deviation is greater than 4 points, apply 20 thickness 1:3 cement mortar find flat; The maximum deviation is less than 4 points, and the uneven area is repaired with 1:3 cement mortar.
3, masonry wall with 20 thick 1:3 cement mortar find flat.
4, the basic wall and find the flat layer should be dry.
The ambient temperature and wall surface temperature at the construction site must not be lower than 5 °C within 24 hours after construction, and the wind power should not exceed 5 degrees.
6, Xiajishigong should take effective measures to prevent rainwater from washing the wall.